The project is concerned with the construction of a new bridge and associated road tie-ins at the Parrie Burn on the Forestry and Land Access Track.
• Construction of a compound area to allow the set-up of office, welfare facilities and concrete washout area.
• Installation of environmental mitigation measures such as silt fencing and drainage ditches.
• Construction of crane and laydown area hardstanding.
• Groundworks to prepare area for bridge construction.
• Bridge Construction.
• Construction of road/track tie-ins.