Project Description
Cumberhead and Dalquhandy wind farm have agreed to a shared connection point, which will consist of shared 120MVA 132/33kV transformer at the new Cumberhead Collector substation which will be situated within the Dalquhandy Wind Farm boundary close to Stockhill Farm, near Coalburn.
Works Included
- Excavation and construction of various concrete foundations
- Excavation of trenches and installation of cable ducts and foul and surface water drainage
- Supply and installation of cable trenches
- Excavation and installation of below ground earthing
- Construction and maintenance of roadways and perimeter footpath
- Construction of palisade fence and gates