A sustainability initiative to install heat pump(s) to increase water temperature from 87 °C to 95 °C using waste/surplus energy.
• Construction of the new building
• Installation of pipework (hot water, cold water and steam).
• Heat exchangers and framework, ducting, heat pump(s).
• A thermal store.
• Pump sets.
• High voltage transformer upgrade and cabling.
• LV installation.
• Buffer.
• Expansion vessels.