Project Description
Construction of a new Home Bargains retail unit including car park, service yard and new utilities.
Works Included
- Vibro compaction piling
- Concrete foundations
- Design, manufacture and construction of portal steel frame
- Lightning protection to portal steel frame
- Gas membrane to unit floor slab
- Preparation and placement of 150mm internal concrete floor slab
- Preparation and placement of 200mm thick external service yard concrete floor slab
- Construction of internal 140mm paint grade blockwork walls
- Construction of external leaf facing brick walls
- Construction of internal perimeter shaft wall
- Design supply and install new shopfront curtain walling
- Design, supply and install roller shutters to curtain walling shopfront
- Fire protection to structural steel members
- Installation of Kingspan insulated roof
- Installation of Kingspan wall cladding
- Design, manufacture and install new internal roof access stair
- Installation of totem sign, ECV charging bays and associated infrastructure
- Design, supply and install external street lighting and associated infrastructure
- New surface and foul water drainage inclusive of connections to SW infrastructure
- Attenuation drainage tanks
- Construction of new porous paving car park inclusive of filtration drainage below
- Hard and soft landscaping
- Provision of new utilities supply – BT, power and water inclusive of leasing with all utility providers
- Off site potable and fire main water works inclusive of circa 120m within public roadways