Project Description
Improvement to the existing Non-Motorised User (NMU) travel provision and provision of new footways/cycleways located along Greenock Road.
The scheme length is 1.8km, commencing at Inchinnan Drive Roundabout, heading east, where it ties in with the Black Cart Cycle Bridge.
Works Included
- Widening out of the eastbound existing footway provision to form a series of shared and separated footways and cycleways
- Dropped crossings to lead cyclists into the new segregated cycleway
- Upgrades to the existing signalised crossing
- New traffic signals
- Repositioned kerb lines
- New diagonal cyclist crossing