Inchinnan Cycleway

Project Description

Improvement to the existing Non-Motorised User (NMU) travel provision and provision of new footways/cycleways located along Greenock Road.

The scheme length is 1.8km, commencing at Inchinnan Drive Roundabout, heading east, where it ties in with the Black Cart Cycle Bridge.




Works Included

• Widening out of the eastbound existing footway provision to form a series of shared and separated footways and cycleways.

• Dropped crossings to lead cyclists into the new segregated cycleway.

• Upgrades to the existing signalised crossing.

• New traffic signals.

• Repositioned kerb lines.

• New diagonal cyclist crossing.

  • Client: Renfrewshire Council
  • Value: £950k
  • Location:Inchinnan