Ionity EV Charging Points

Project Description

Construction of substation and installation of electric vehicle fast charging stations.




Works Included

  • Site strip
  • Bulk excavation
  • Capping with type 1
  • Installation of new linear drainage
  • Kerbing
  • Surfacing and white lining
  • Precast concrete base units for charging points
  • Protective bollards
  • Cable ducting
  • Installation of perimeter fencing
  • Landscaping
  • Client: Centrica
  • Value: £100k
  • Location:Perth

Gallery

Projects like this