Project Description
This project is currently on-site and involves extending the current substation platform to create space to allow additional electrical infrastructure to be installed.
Works Included
- Creation of a new bellmouth access on the B741 to allow access to the work area
- Construction of temporary drainage measures to control any water generated during construction activities
- Cut and fill activities to achieve the required levels for the extended platform
- Deep soil mixing to stabilise the ground under the extended platform
- Piling operations
- Construction of a concrete slab
- Stoning up of the extended platform to the required level