Old Dalmarnock Road Green Infrastructure

Project Description

The green infrastructure project involved vacant land beside the Bridgeton Community Learning Campus transformed into ‘active greenspace’.




Works Included

• Clearance of rubbish and fly tipped debris

• Thinning out and opening up the existing woodland, forming new pathways and openings with good lines of visibility.

• Introducing a junior bike circuit.

• Creating a community growing space close to the BCLC.

• Forming a new path and opening to the existing play area off Dale Street.

• Introducing some informal natural play elements into the existing open space.

• Improving the existing pathways.

• Introducing new fencing, gateways and seating at different points.

• Planting with native ground flora species to improve biodiversity throughout.

  • Client: Clyde Gateway
  • Value: £1m
  • Location:Glasgow

Gallery

Projects like this