Works are required to re-align a junction to form access to a new logistics park development where Luddon have been appointed to deliver the S278 works and S104 drainage including:
• SW connection to the United Utilities network.
• Highways drainage.
• Retaining wall construction.
• Road construction, and in areas road re-alignment.
• Re-alignment of access to three local businesses.
• Surfacing to new alignment.
• White Lining.
• Street lighting.