Sizing John Phase 2 Battery Energy Storage System (BESS), St Helens

Project Description

Civils Package as part of Phase 2 of the BESS site where Luddon have been appointed to deliver:




Works Included

• Earthworks excavation to the platform
• Surface water drainage
• Earthing excavation and backfill
• Platform construction with capping and MOT Type 3
• Screw piled foundations to the BESS and RMU
• Site wide HV and LV ducting and drawpits
• Site wide GRP troughs for LV and comms cables
• Kerbing and road construction
• Gravel finishes

  • Client: Cobalt Energy
  • Value: £2.8m
  • Location:Rainhill, St Helens

Gallery