Thornton York, Battery Energy Storage System (BESS)

Project Description

Civil engineering works required to accommodate the BESS and it’s ancillary equipment.




Works Included

The works consisted of;

  • Full enabling works
  • Topsoil strip
  • Capping and drainage works
  • Trenching and ducting works across site
  • Reinforced concrete foundations to accommodate 64 BESS Units and 31 PCS units
  • Temporary works cofferdam installation
  • Reinforced concrete transformer base and Control building bases
  • Type 3 and gravel finish
  • Type 3 road construction
  • Client: H&MV
  • Value: £11.1m
  • Location:York