Design and build of 25,000ft² Maturation Warehouse at London Road, Glasgow.
The warehouse will provide storage for spirit casks.
Works Included
- Site clearance and pile mat preparation
- 720no stone vibration piles installed, to support the foundations and warehouse floor
- 300m of surface drainage and associated manholes
- Ring beam foundations, extending some 200m in length
- Propped steel frame installation
- 2,400m² of Kingspan insulated roof panels
- Cladding to walls, including ridge flashings, drip trays and downpipes
- Louvre and roof cowl installation to ensure appropriate ventilation
- 2,400m² of Visqueen membrane installed under concrete slab, with associated steel mesh, in line with specifications
- 350m³ of concrete cast to form floor within warehouse
- Electrical ducting and containment
- Mechanical sprinkler system installation, hydrant installation and new underground water mains
- Construction of new electrical and mechanical plant rooms
- Roller shutter door and steel pedestrian doors installed
- Concrete retaining wall installation
- Road and footpath upgrades around perimeter of building
- The warehouse will be a DSEAR explosive environment when occupied and therefore ATEX rated service installations shall be required along with increased fire suppression