The construction of two state-of-the-art maturation warehouses adjacent to the existing Glenglassaugh facility.
Warehouse 7, covering a footprint of 3,861m², and Warehouse 8, with 1,860m², are both designed with steel frames and equipped with advanced fire protection systems.
• Construction of 2 new maturation warehouses.
• Installation of composite roof and wall cladding.
• Roof ridge venting.
• Removal of 6,900m³ of topsoil.
• 4,830m³ of cut and fill.
• Vibro-compaction piles.
• Installation of storm drainage, power, and water supply connections.
• 3,752m² concrete access road and service yard.