Project Description
The conversion of Units 4 and 5 at Gallagher Retail Park into a modern M&S outlet.
The complex nature of the work required a phased approach to ensure the highest standards of safety and quality.
Works Included
- Downtaking of existing 1st floor steel
- Isolated break out of existing GF slab for piling and new foundations
- Installation of steelwork, decking and concrete for a new 1st floor slab
- Various areas of new steelwork
- Infill brick and block panels to building envelope
- Internal blockwork to perimeter walls on GF and 1st
- Internal blockwork for stair cores
- Fire protection to steel
- New windows and areas of Curtain Walling, including new structural glass at unit entrance
- New external doors
- Cladding and roofing alterations and improvements
- Installation of internal drainage
- Installation of service ducts
- Externally, reinstatement works after drainage installation and installation of free issue trolley